Connect the 201i server and devices as follows:
10
Complete the installation of the 201i server as follows:
See page 159.
11
Continue with the CallPilot <switch model> and CallPilot
Server Configuration guide for your switch and server.
40
Connect the monitor, keyboard, and mouse to the 201i
server faceplate (see page 142).
Connect the CD-ROM and tape drives to the
intermediate SCSI cable (see page 144).
Connect the multi I/O cable to the ELAN and CLAN
network hubs (see page 153).
Note: If more than 3 m (10 ft) of multi I/O cable is
required, use the supplied RJ-45 female-to-female
gender change jacks to attach additional cable. Up to
76.2 m (250 ft) of cable length is supported.
Connect the modem to the multi I/O cable (maximum
length 15 m (50 ft) (see page 156).
Connect the power cords for all devices, and then power
them up.
Connect the intermediate SCSI cable to the 201i server
faceplate.
Close the lock latches on the 201i server.
Boot the 201i server to the operating system.