Installation Checklist - Nortel CallPilot 201i Hardware Installation

Callpilot release 4.0
Hide thumbs Also See for Nortel CallPilot 201i:
Table of Contents

Advertisement

November 2006

Installation checklist

The following checklist identifies the steps required to install the 201i server
and peripheral devices. For more details, see Chapter 8, "Connecting
peripheral devices to the 201i server."
WARNING
Risk of personal injury and hardware failure
.
The power outlets used by the CallPilot server and its
peripheral devices must be connected to the same ground
reference as the one used by the Meridian 1 switch or
Succession 1000 system with MGate cards (NTRB18CA)
connected to the CallPilot server. If this requirement is not met,
power transients can cause personal injury and hardware
failure.
Step
Description
1
Ensure that you have reviewed the "Installing CallPilot"
section in the CallPilot Installation and Configuration Task
List and completed stage 1 of the "Installation checklist."
This includes the following tasks:
201i Server Hardware Installation
Unpack the server, and ensure you have all the items you
need (see page 41).
Complete the following checklists that are provided in
the CallPilot Installation and Configuration Task List:
— "CallPilot software media and documentation
checklist"
— "CallPilot server hardware checklist"
Inspect the server for any damage that might have
occurred during shipping (see page 41).
Preparing for installation
Check
37

Advertisement

Table of Contents
loading

Table of Contents