November 2006
daisy chain scenarios
Meridian 1
131
Option 11C
132
Option 11C Mini
Succession 1000
installation, attention
supported
122
SCSI drive LED
22
SCSI IDs, setting
CD-ROM drive
tape drive
128
secondary backplane connector
,
description
48
diagram
51
installing for Meridian 1
reason for moving
required tools
52
server, 201i
components, diagram
damaged, what to do
,
faceplate
19
138
inspecting
42
installation
–
checklist
37
prerequisites
installing
large Meridian 1 systems
Option 11C
72
Option 11C Mini
Succession 1000
network setup
Meridian 1
24
Succession 1000
peripheral device connectors, diagram
primary components
,
starting
139
159
unpacking
41
setting
CD-ROM drive DIP switches
device termination
CD-ROM drive
tape drive
134
201i Server Hardware Installation
132
133
,
,
126
128
130
126
51
–
52
55
50
18
42
40
44
56
72
108
26
16
–
161
127
133
modem DIP switches
SCSI IDs
CD-ROM
tape drive
single-point ground
slot configuration, Succession 1000
slot requirements
small Meridian 1 systems
Succession 1000
software
administration
Succession 1000 requirements
Succession 1000
card slots
configuring
covers, replacing
documentation
multi I/O cable, installing
network setup
power cable
installing
SCSI cable
slot requirements
system description
Call Server
Media Gateway
Media Gateway Expansion
software requirements
switch
connection, establishing with multi I/O
cable
connector, multi I/O cable
requirements
switches, setting DIP
138
CD-ROM drive
modem
124
T
tape drive
back panel, diagram
124
126
128
36
44
72
–
,
97
98
107
102
107
–
98
100
–
114
116
103
117
26
119
110
44
96
96
97
102
–
153
155
29
44
127
129
Index
–
98
100
102
–
118
97
175