Sign In
Upload
Manuals
Brands
Nortel Manuals
Switch
20000
Nortel 20000 Manuals
Manuals and User Guides for Nortel 20000. We have
4
Nortel 20000 manuals available for free PDF download: Hardware Installation And Maintenance, Hardware Description, Preparation Manual, Terminology
Nortel 20000 Hardware Installation And Maintenance (874 pages)
Brand:
Nortel
| Category:
Switch
| Size: 18.97 MB
Table of Contents
Table of Contents
7
About this Document
33
Who Should Read this Document and Why
33
How to Use this Document
34
What's New in this Document
34
16-Port OC-3/STM-1 POS and ATM FP with PEC NTHW44
41
An Additional Version of the Lower and Upper Cooling Units
41
Enclosing a NEBS 2000 Frame with Doors and Side Panels
43
Structural Changes
45
Related Documents
46
How to Get more Help
47
Overview of Hardware Tasks
49
Safety Considerations and Best Practices
53
Risk of Personal Injury
54
Risk of Service Loss
56
Risk of Equipment Damage
57
Fastening Captive Screws
58
Fastening Termination Panels
58
Avoiding Damage from ESD
59
Choosing Slots for Fps
61
Equipment Maintenance
63
Accessing Equipment Inside a NEBS 2000 Frame with a Door
63
Air Filter Replacement
64
Equipment Vacuuming
64
Fiber Cable Cleaning
65
SFP Optical Module Cleaning
65
Monitoring Equipment Status Leds
65
Storing and Transporting Circuit Cards
66
Handling Cables
66
Power Cables
67
Processor Card Cables
67
Hot-Swapping Hardware Parts
67
Packing and Unpacking a Processor Card or Module
68
Processor Card Compatibility
68
Alarm Hardware
71
BIP Alarm Module Replacement
72
BIP Alarm Module Replacement Task Flow
72
BIP External Alarm Cable Replacement
73
Prerequisites to BIP External Alarm Cable Replacement
73
BIP External Alarm Cable Replacement Task Flow
73
Alarm/Bits Module
75
Alarm/Bits Module Replacement
76
Prerequisites to Alarm/Bits Module Replacement
76
Alarm/Bits Module Replacement Task Flow
76
Timing Cable Installation
79
Prerequisites to Timing Cable Installation
79
Timing Cable Replacement
81
Prerequisites to Timing Cable Replacement
81
Timing Cable Replacement Task Flow
81
CP and FP Cables
85
Cable Routing
86
FP Cable Replacement
89
SFP Module Replacement
92
Control Processors
95
CP Upgrade
96
Failed CP Replacement
98
Cooling Units
99
Cooling Unit Replacement
100
Fan Controller Replacement
102
Fan Replacement
104
Prerequisites to Fan Replacement
104
Fan Replacement Task Flow
105
Temperature Sensor Replacement
106
Prerequisites to Temperature Sensor Replacement
106
Temperature Sensor Replacement Task Flow
106
Temperature Sensor Bracket Assembly Replacement
109
Prerequisites to Temperature Sensor Bracket Assembly Replacement
109
Temperature Sensor Bracket Assembly Replacement Task Flow
109
Fabrics
111
Fabric Replacement
111
NEBS 2000 Frame Accessories
115
Door Installation Onto a NEBS 2000 Frame
117
Door Hardware Removal from a NEBS 2000 Frame
125
Illuminated Brandline Cover Installation
131
NEBS 2000 Frame Enclosure Installation
134
Side Panel Installation Onto a NEBS 2000 Frame
135
Function Processors
139
FP Addition
140
Prerequisites to FP Addition
140
FP Addition Task Flow
140
FP Decommissioning
143
Prerequisites for FP Decommissioning
143
FP Decommissioning Task Flow
143
FP Upgrade
145
Prerequisites to FP Upgrade
145
FP Upgrade Task Flows
146
Replacement of a Failed FP
150
Prerequisites to Failed FP Replacement
150
Failed FP Replacement Task Flow
150
Replacement of an FP with One of a Different Card Type
153
Prerequisites to Replacement of an FP with One of a Different Card Type
153
Initial Switch Hardware Installations
155
Installation of a Second Switch into a NEBS 2000 Frame
156
NEBS 2000 Frame Installation
161
Parts Installation in a Passport 15000 in a NEBS 2000 Frame
165
Parts Installation in a Passport 20000 in a NEBS 2000 Frame
168
Passport 15000-VSS Installation
171
Passport 15000 or 20000 Switch Installation into an EIA Rack
173
MAC Address Module
179
MAC Address Module Replacement
179
Prerequisites to MAC Address Module Replacement
179
MAC Address Module Replacement Task Flow
180
Peripheral Equipment
183
Modem Installation
184
Prerequisites to Modem Installation
184
Modem Installation Task Flow
185
Multiport Aggregate Device Installation
186
Prerequisites to Multiport Aggregate Device Installation
186
Multiport Aggregate Device Replacement
188
Shasta 5000 Installation
190
Power-And-Ground Hardware of a Passport 15000 or 20000
193
BIM Replacement
194
BIP Power-And-Ground Cable Installation
197
BIP Power Input Cable Replacement
201
BIP Replacement
204
Power-And-Ground Cable Assembly Replacement
207
Powerup of a Passport 15000 or 20000
210
PIM Replacement
214
Shelf Assembly
217
Shelf Assembly Replacement
218
Sparing and Fanout Panels
223
Sparing Panel Replacement
224
Fanout Panel Replacement
227
Hardware Procedures
229
Anchoring the NEBS 2000 Frame
230
Additional Information for Installing the Frame Anchors
235
Assembling a BIP External Alarm Cable
237
Assembling Sparing Panel NTQS31
249
Bundling FP Cables
251
Cabling the Second Cooling Unit
255
Checking the Backplane Pins
258
Checking Power Input Cables to the BIP
261
Checking Power Output from a System of Ac Rectifiers
266
Checking Power Output Connections from the BIP
273
Checking the Connectivity between Fps and Sparing Panels
275
Checking the Final Status of All Leds
277
Checking the Operation of External Alarms
279
Cleaning an SFP Optical Module
281
Cleaning LC or SC Connectors
285
Cleaning MT-RJ Connectors
290
Cleaning the Bore of a Transceiver
293
Configuring Modem Software
294
Connecting a CP Ethernet Cable
296
Connecting a CP Local Operator Terminal Cable
299
Connecting a CP Modem Cable
300
Connecting a Passport 15000 or 20000 to an Edgelink 100
302
Connecting a PIM Cable
305
Connecting a Power Input Cable to a Terminal Block
307
Connecting a Temperature Sensor Cable Assembly
312
Connecting Alarm Cables to the Alarm/Bits Module
315
Connecting an FP Cable
320
Connecting Other Cables to a BIP
329
Connecting Power Input Cables to the BIP
330
Connecting Power Output Cables to a System of Ac Rectifiers
339
Determining if You Need to Use Inline Attenuators with Optical Fps
345
Disconnecting a Power Input Cable from a Terminal Block
347
Disconnecting Power Input Cables from the BIP
353
Disconnecting Other Cables from a BIP
357
Fastening Adjacent Frames Together
359
Grounding a Passport 15000-VSS
362
Grounding a Shasta 5000 to a NEBS 2000 Frame
365
Grounding the NEBS 2000 Frame
368
Installing a 19-Inch Sparing Panel
372
Installing a BIM
374
Installing a BIP Alarm Module
378
Installing a BIP External Alarm Cable
379
Installing a BIP External Alarm Cable to an MFA150
381
Installing a BIP Onto a NEBS 2000 Frame
386
Installing a BITS Cable
388
Installing a Blank Processor Card
393
Installing a Brandline Cover or a Top Cover
396
Installing a CP
399
Installing a Cosmetic Extension Filler
402
Installing a Door
407
Installing a Door Catch Onto the Lower Right of a Frame
416
Installing a Door Catch Onto the Upper Right of a Frame
422
Installing a Door Hinge Onto the Lower Left of a Frame
426
Installing a Door Hinge Onto the Upper Left of a Frame
430
Installing a Fabric Card into a Passport 15000
434
Installing a Fabric Card into a Passport 20000
439
Installing a Fan
446
Installing a Fan Controller
452
Installing a Fanout Panel
463
Installing a Fiber Management Unit
465
Installing a Kickplate
468
Installing a Kickplate Extension
470
Installing a Lower Cooling Unit
473
Installing a Multiport Aggregate Device
478
Installing a PIM
485
Installing a PIM Cable
487
Installing a Power-And-Ground Cable Assembly
489
Installing a Shasta 5000 Air-Flow Grill
495
Installing a Shasta 5000 Cable Management Assembly
497
Installing a Shasta 5000 Filler Panel
499
Installing a Shasta 5000 Shelf Assembly
501
Installing a Shelf Assembly
503
Installing a Shelf Assembly Onto Adapter Brackets
505
Installing a Shelf Filler Panel
509
Installing a Shelf-Based BIP
512
Installing a Shelf-Based Cooling Unit
514
Installing a Side Frame Panel, Extended Size
518
Installing a Side Frame Panel, Regular Size
523
Installing a Sparing Panel
532
Installing a Strain-Relief Bar
535
Installing a Temperature Sensor Bracket Assembly
536
Installing a Temperature Sensor for an Upper Cooling Unit
542
Installing a Temperature Sensor Inside a Lower Cooling Unit
546
Installing a Timing Cable Adaptor NTPN81
551
Installing a Timing Cable DS1 Wire-Wrap NTHW75
554
Installing a Timing Cable for E1 Unbalanced NTHR75
558
Installing a Top Cover Onto a Frame Bracket
561
Installing a Top Frame Bracket Onto a NEBS 2000 Frame
568
Installing Adapter Brackets Onto a Shasta 5000
572
Installing an FP
574
Installing an Illuminated Brandline Cover
578
Installing an SFP Optical Module
588
Installing an Upper Cooling Unit
592
Installing Cable Management Brackets
597
Installing EMI Filters on the Alarm/Bits Module
599
Installing Extended Cable Management Brackets
601
Installing Fiber Cables through the Fiber Management Unit
605
Installing Front Adapter Brackets
610
Installing Front or Rear Frame Panels
612
Installing Grounding Tape on Rack Uprights
618
Installing High-Density Cable Management Brackets
619
Installing NEBS 2000 Frame-To-EIA Adapter Brackets
622
Installing Short Adapter Brackets on the Rear of the Rack
624
Installing Short Adapter Brackets on the Front of the Rack
628
Levelling the Frame or Frame Pair
629
Locking or Unlocking a Door on a NEBS 2000 Frame
631
Loading Cards in Sequence with Software
633
Making a BITS Cable
635
Moving a Frame into Its Anchoring Position
639
Packing a Processor Card or Module
642
Placing the NEBS 2000 Frame Onto the Footprint
643
Powering down a BIM
645
Powering up a System of Ac Rectifiers
648
Preparing the NEBS 2000 Frame for Installing Adapter Brackets
650
Removing a BIM
652
Removing a BIP
655
Removing a BIP Alarm Module
656
Removing a BITS Cable
658
Removing a Blank Processor Card
662
Removing a Brandline Cover from a Top Frame Bracket
663
Removing a Brandline Cover, Illuminated, from a Top Frame Bracket
666
Removing a CP
670
Removing a Door
672
Removing a Fabric Card from a Passport 15000
677
Removing a Fabric Card from a Passport 20000
679
Removing a Fan
682
Removing a Fan Controller
686
Removing a Fanout Panel
692
Removing a Horizontal Frame from the Pallet
693
Removing a Kickplate
698
Removing a Lower Cooling Unit
701
Removing a Multiport Aggregate Device
704
Removing a PIM
707
Removing a Power-And-Ground Cable Assembly
710
Removing a Shelf Assembly
714
Removing a Shelf Filler Panel
721
Removing a Side Frame Panel, Regular or Extended Sizes
724
Removing a Sparing Panel
728
Removing a Temperature Sensor Bracket Assembly
730
Removing a Temperature Sensor for an Upper Cooling Unit
733
Removing a Temperature Sensor from a Lower Cooling Unit
737
Removing a Timing Cable Adapter NTPN81
742
Removing a Timing Cable for DS1 NTHW75
743
Removing a Timing Cable for E1 Unbalanced NTHR75
745
Removing a Vertical Frame from the Pallet
747
Removing an FP
750
Removing an FP Cable
755
Removing an SFP Optical Module
759
Removing an Upper Cooling Unit
762
Removing Door Hardware from the Bottom of a Frame
765
Removing Door Hardware from the Top of a Frame
769
Removing Fiber Cables from the Fiber Management Unit
773
Removing Front or Rear Frame Panels
774
Removing the Packaging from a Passport in a Frame
776
Replacing a BIP External Alarm Cable
778
Replacing a BIP External Alarm Cable to an MFA150
781
Replacing a CP Ethernet Cable
783
Replacing a Cable Management Channel Cover
785
Replacing a Cooling Unit Alarm Cable
787
Replacing a Cooling Unit Power Cable
789
Replacing a Fiber Cable in a Fiber Management Unit
792
Replacing a Local Operator Terminal Cable
795
Replacing a PIM Cable
796
Replacing a Shasta 5000 Interface Cable
799
Replacing an Air Filter
800
Replacing an Alarm Cable Assembly to the Alarm/Bits Module
807
Replacing an Edgelink 100 Interface Cable
811
Replacing the Alarm/Bits Module in a Passport 15000
814
Replacing the Alarm/Bits Module in a Passport 20000
819
Replacing the MAC Address Module in a Passport 15000
822
Replacing the MAC Address Module in a Passport 20000
825
Routing FP Cables
827
Routing Power Cables from Overhead to the BIP
832
Routing Power Cables from under the Floor to the BIP
836
Seating Cards from the Transportation Position
842
Seating Fabrics from the Transportation Position
845
Setting Modem Dip Switches
852
Switching on the BIP Circuit Breakers
854
Testing Sparing Panel Connectivity
857
Testing the Power Output from a System of Ac Rectifiers
859
Testing the Power to the BIP
860
Unpacking a Processor Card or Module
867
Unpacking a Shelf Assembly
868
Unpacking the Shasta 5000
869
Vacuuming Equipment
870
Advertisement
Nortel 20000 Hardware Description (390 pages)
Brand:
Nortel
| Category:
Switch
| Size: 6.05 MB
Table of Contents
Table of Contents
7
Contents
11
Contents
13
Contents
15
About this Document
27
Who Should Read this Document and Why
27
What You Need to Know
27
What's New in this Document
28
Structural Changes
31
16-Port OC-3/STM-1 POS and ATM FP with PEC NTHW44
33
An Additional Version of the Lower and Upper Cooling Units
33
Enclosing a NEBS 2000 Frame with Doors and Side Panels
34
Voice Services Processor 3 with Optical TDM Interface (2Poc3Chsmirvsp3)
34
Y-Protection for Dual 16-Port OC-3/STM-1 POS and ATM Fps
34
Related Documents
34
How to Get more Help
35
Introducing Passport 15000 or 20000 Hardware
37
Passport 15000 Overview
37
Passport 15000-VSS Overview
40
Passport 20000 Overview
42
Passport 15000 and 20000 Switch Architecture
44
Frame Assembly Overview
46
Breaker Interface Panel Overview
46
Shelf Assembly Overview
46
Control and Function Processors Overview
47
Upgrading Processor Cards
47
Cables and Cable Management Overview
48
Peripheral Interworking Equipment
48
Passport 15000 or 20000 Equipment Status
48
Hardware Parts that Can be Replaced or Upgraded
49
Breaker Interface Panel
51
Front Cover of the BIP
53
Breaker Interface Modules (Bims)
54
BIP with Two or Four Bims
54
Location of the Bims
55
Functions of the Bims
55
Bims Distributing Power to Pims
56
Combined BIM Pairs in a BIP
60
Front Panel of a BIM
60
BIM Power Filters
61
BIM Filler Plates
62
Alarm Module
62
Location of the BIP Alarm Module
62
Functions of the BIP Alarm Module
62
Front Panel of the BIP Alarm Module
63
Hardware Alarm Definitions
66
BIP Alarm LED Board
67
Alarm Cable Connectors
68
Location of the BIP Alarm Connectors
68
Functions of the BIP Alarm Connectors
70
Features of the BIP Alarm Connectors
70
BIP Alarm Connections from a System of Ac Rectifiers
71
Power Connections to and from the BIP Backplane
73
Location of the BIP Backplane Power Connections
73
Function of the BIP Backplane Power Input Connections
74
Hardware for Connecting Power Input Cables to the BIP
75
Using an Optional Power-And-Ground Assembly
76
Function of the BIP Backplane Power Output Connections
79
Sources of DC Input Power to the BIP Backplane
83
Powering the BIP from Ac Rectifiers
83
Grounding the Passport and Interworking Equipment
85
Shelf Assembly
87
Common Backplane
92
Backplane Location and Physical Description
92
Function of the Common Backplane
93
Fabric Cards
94
Fabric Card Carrier
94
Fabric Card Transportation
97
Fabric Card Location and Physical Description
98
Function and Operation of the Fabric Cards
101
Fabric LED Behavior Is Different from Fps
104
Fabric Replacement Can Affect Traffic
104
Fabric Replacement Can Affect System Cooling
105
Fabric Replacement May Need a Firmware Upgrade
106
Power Interface Modules (Pims)
107
Location and Physical Description of the Pims
107
PIM Faceplate
107
Power LED Status Indicators for Pims
110
PIM Cable Assembly
110
Media Access Control (MAC) Address Module
112
Alarm/Bits Module
114
Types of Alarm/Bits Modules
115
Alarm/Bits Module Faceplate
116
Alarm/Bits Module Cable Assemblies
122
Timing Cable Specifications for the DS1 Circuit
123
Timing Cable Specifications for the E1 Balanced Circuit
123
Timing Cable Specifications for the E1 Unbalanced Circuit
124
Line Build out Application Settings
125
Cooling Units
126
Environmental Control Equipment
129
The Impact of Heat Dissipation on Rising Shelf Temperatures
131
Fans
133
Fan Controllers
133
Air Filters
133
Temperature Sensors
134
Cooling Unit LED Indications
134
Cooling Unit Connections
135
NEBS 2000 Frame Enclosure
137
Enclosing the Frame with Doors and Extended Side Panels
137
Enclosing the Frame with Regular Side Panels and Frame Cover Panels
139
Control and Function Processors
141
Connecting a Passport to Another Node
142
Connecting Two Passports
143
Connecting Nodes in a Passport 15000-VSS
143
Connecting a Passport 15000 or 20000 to a Shasta 5000
144
Connecting a Passport 15000 or 20000 to an Edgelink 100
144
Blank Processor Card
146
Control Processors
148
CP Hardware
152
CP Software Requirements
152
CP Cables
153
Ethernet CP Pinout and Signal Names
158
V.24 CP Pinout and Signal Names
158
CP Line Rate
159
CP Compliance with Standards
159
Ethernet Compliance with Standards
159
2-Port Ds3Ch TDM FP
160
2-Port Ds3Ch TDM Line Connections
162
2-Port Ds3Ch TDM Cable Assemblies
162
Assigning Sparing Panel Connections for 2-Port DS3C TDM Fps
164
4-Port Ds3Ch FR FP
166
4-Port DS3 FR FP Line Connections
167
4-Port DS3 FR FP Cable Assemblies
168
Assigning Sparing Panel Connections for 4-Port DS3 Fps
171
4-Port Ds3Ch ATM FP with IMA
175
4-Port Ds3Ch ATM FP with IMA Line Connections
176
4-Port Ds3Ch ATM FP with IMA Cable Assemblies
176
4-Port Ds3Ch FP with AAL1 CES
180
4-Port Ds3Ch FP with AAL1 CES Line Connections
181
4-Port Ds3Ch FP with AAL1 CES Cable Assemblies
181
12-Port DS3 FP
185
12-Port DS3 FP Line Connections
187
12-Port DS3 FP Cable Assemblies
187
Assigning Sparing Panel Connections for a 12-Port DS3 or E3
192
12-Port E3 ATM FP
195
12-Port E3 FP Line Connections
197
12-Port E3 FP Cable Assemblies
197
2-Port General Processor with Disk
202
2-Port Gpdsk Components
203
2-Port Gpdsk Pinout and Signal Names
204
100Baset Ethernet Cable Assembly
204
4-Port Gigabit Ethernet FP
205
4-Port Gigabit Ethernet Cable Assemblies
206
Custom-Making an LC Cable Assembly for an NTHW49
207
SFP Modules for an NTHW49
208
32-Port E1 TDM FP
209
32-Port E1 TDM Line Connections
211
32-Port E1 TDM Cable Assemblies
211
Assigning Sparing Panel Connections for 32-Port E1 TDM Fps
213
6-Module Packet Server FP
215
6Mpktservsp Components
217
6Mpktservsp Sparing
217
6Mpktservsp Configuration
217
4-Port OC-3/STM-1 ATM Fps
218
4-Port OC-3/STM-1 ATM FP Cable Assembly
220
4-Port OC-3/STM-1 ATM FP Optical Interface Characteristics
220
4-Port OC-3/STM-1Ch TDM/CES FP
223
4-Port OC-3/STM-1Ch TDM/CES FP Cable Assembly
225
4-Port OC-3/STM-1Ch TDM/CES FP Optical Interface Characteristics
225
16-Port OC-3/STM-1 ATM FP with MT-RJ Connectors
227
Cable Assemblies for an NTHW21
229
Optical Interface Characteristics for an NTHW21
229
16-Port OC-3/STM-1 ATM FP with LC Connectors
231
Cable Assemblies for an NTHW31
233
Cable Specifications for Custom-Making LC Cable Assemblies
233
Optical Interface Characteristics for an NTHW31
235
16-Port OC-3/STM-1 POS and ATM FP
238
Cable Assemblies for an NTHW44
240
SFP Modules for an NTHW44
240
Optical Interface Characteristics for an NTHW44
241
Cable Specifications for Custom-Making LC Cable Assemblies
244
Specifications for Y-Splitter Cable Assemblies for Y-Protection
246
1-Port OC-12/STM-4 FP
250
1-Port OC-12/STM-4 FP Cable Assembly
252
1-Port OC-12/STM-4 FP Optical Interface Characteristics
252
4-Port OC-12/STM-4 ATM FP
254
4-Port OC-12/STM-4 ATM FP Cable Assembly
256
4-Port OC-12/STM-4 ATM FP Optical Interface Characteristics
256
1-Port OC-48/STM-16 ATM FP with APS
258
1-Port OC-48/STM-16 ATM FP with APS Cable Assembly
260
1-Port OC-48/STM-16 ATM FP with APS Optical Interface Characteristics
260
1-Port OC-48/STM-16 POS FP
262
1-Port OC-48/STM-16 POS FP Cable Assembly
263
1-Port OC-48/STM-16 POS FP Optical Interface Characteristics
264
1-Port STM-1Ch FP
266
1-Port STM-1 FP Cable Assembly
267
1-Port STM-1 FP Optical Interface Characteristics
267
VPN Extender Card
269
Vpnxc Components
271
Vpnxc Configuration
271
Vpnxc Sparing
271
Vpnxc Compliance with Standards
272
Voice Services Processor 2 (VSP2) FP
273
Voice Services Processor 3 (VSP3) FP
274
VSP3 Line Connections
275
VSP3 Cable Assemblies
276
VSP3 Sparing
278
Equipment to Interface VSP3 Ethernet Ports
278
Voice Services Processor 3 with Optical TDM Interface (VSP3-O) FP
283
VSP3-O FP Line Connections
284
VSP3-O FP Cable Assembly
285
SFP Optical Module
288
SFP Optical Module Cable Assemblies
290
Optical Module Compliances
290
Termination Panels for Fps
291
Basic Functionality and Operation of a Sparing Panel
292
Common Characteristics of a Sparing Panel
294
Power Source of a Sparing Panel
295
Basic Functionality and Operation of a Fanout Panel
296
12-Port DS3 or E3 Fanout Panel NTHW52
297
Assigning the Fanout Panel Cable Connections
298
Assigning 12-Port DS3 or E3 Fanout Panel Connections
299
12-Port DS3 or E3 Sparing Panel NTQS31
300
Testing a Transmit Port on the NTQS31
303
4-Port DS3 Sparing Panel NTHR79
304
3-Port DS3, E3, or E1 Sparing Panel NTFP99AA
306
Multiport Aggregate Device for a 32-Port E1 TDM
308
Multiport Aggregate Device Connections and Cabling
310
Multiport Aggregate Device Power and Grounding Requirements
311
Multiport Aggregate Device Leds
311
Multiport Aggregate Device Alarms
312
Dimensions of the Termination Panels
313
Cables and Cable Management
315
Managing Power Cables
315
Managing Telecom Cables
315
Basic Cable Management Brackets for Low-Density Cabling
316
Cable Management Brackets for High-Density Cabling
319
High-Density Cable Management Brackets
320
Very High-Density Cable Management Brackets
321
Hardware to Manage Fiber Cable Slack Near the Switch
326
Location of Specific FP Cables in a Bundle
328
Cabling a Card with or Without a Termination Panel
330
Preparing OC or STM Fiber Distribution Cables
331
LC Fiber Cables and Connectors
332
MT-RJ Fiber Cables and Connectors
333
Preparing Coax Distribution Cables
335
Preparing Control Port Cables
338
Handling Alarm Cables
340
Prefabricated DS3 or E3 Cable Assemblies
340
Using Status Indicator Leds and Sounds
343
Follow-Me Leds
344
What to Do When a Lit Red LED Is Detected
344
What to Do When a Lit Amber LED Is Detected
345
Hierarchy of Leds and Sounds
345
Status Leds of a BIP Alarm Module
346
Testing the Leds
347
Status Leds of a BIM
349
Status Leds of a PIM
350
Status Leds of a Fabric
352
Status Leds of a Fabric in a Passport 15000
352
Status Leds of a Fabric in a Passport 20000
354
Status Leds of a CP or an FP Card
356
Status Leds of a CP
357
Status Leds of an FP
358
Status Leds of the Ethernet Ports on an NTHW49
359
Status Leds of a Cooling Unit Fan
362
Status Leds of a Sparing Panel
365
Turning off the Audible Alarm
366
Field Replaceable Units
367
Frus that Plug into or Get Screwed Onto a Passport 15000 or 20000
368
FP Cards, SFP Modules, and Termination Panels
370
Control Processor (CP) Cards
372
Frus for an MFA150 System of Ac Rectifiers
385
Nortel 20000 Preparation Manual (170 pages)
Brand:
Nortel
| Category:
Switch
| Size: 1.96 MB
Table of Contents
Table of Contents
7
Contents
9
Contents
11
About this Document
15
What You Need to Know
15
Who Should Read this Document and Why
15
What's New in this Document
16
16-Port OC-3/STM-1 POS and ATM FP with PEC NTHW44
17
An Additional Version of the Lower and Upper Cooling Units
17
Enclosing a NEBS 2000 Frame with Doors and Side Panels
18
Voice Services Processor 3 with Optical TDM Interface (2Poc3Chsmirvsp3)
18
Y-Protection for Dual 16-Port OC-3/STM-1 POS and ATM Fps
18
How to Get more Help
19
Related Documents
19
Safety Information
21
Personal Safety
22
Safe Equipment Handling
23
Avoiding Equipment Damage from Static Electricity
24
Moving the Frame Safely
24
Installing the Switch Safely
26
Compliance with Electrical and Safety Standards
28
Storing and Transporting Circuit Cards
28
Planning Considerations
29
Task Flow of Planning Considerations
29
Task Flow Navigation
31
Adding a Switch to an Anchored NEBS 2000 Frame
32
Assess Air Filter Maintenance
33
Table 1 Combinations of Bims in a BIP
33
Assess Cable Management
35
Task Flow of Cable Management Assessment
35
Determining Your Cable Density
37
Table 3 Diameters of Processor Card Cables
38
Managing High-Density Cabling
40
Managing Low-Density Cabling
42
Managing very High-Density Coax Cabling
43
Placing a Fiber Management Unit for Cable Slack
45
Using Custom-Made Processor Card or System Cables
47
Assess Environmental Requirements
49
Operational Environment
49
Power Dissipation
51
Bulk Heat Dissipation
52
Prerequisites for Your Earthquake Zone and Application
53
Assess Power Cable Location
54
Ceiling Requirements
54
Flooring Requirements
54
Assess the Location of a Passport 15000 or 20000
55
General Guidelines for Placing the Equipment
55
Equipment Size and Weight
58
Table 8 Base Weight of a Frame Shipped with One Passport 15000 Switch (Shelf)
60
Table 9 Base Weight of a Frame Shipped with Two Passport 15000 Switches (Shelves)
61
Table 10 Base Weight of a Frame Shipped with One Passport 20000 Switch (Shelf)
62
Table 11 Base Weight of a Frame Shipped with Two Passport 20000 Switches (Shelves)
63
Table 12 Weight of Optional or Additional Passport 15000 or 20000 Parts
66
Table 13 Weights of a Frame with a Passport 15000-VSS
68
Table 15 Weight of Passport 15000 Shelf-Based Parts that Are Installed in a 23-Inch EIA Rack
69
Table 16 Weight of Passport 20000 Shelf-Based Parts that Are Installed in a 23-Inch EIA Rack
70
Table 17 Optional and To-Be-Determined Weights for a Passport 15000 or 20000 in a 23-Inch EIA Rack
71
Front and Rear Access to Switch Hardware
72
Assess the Location of a System of Ac Rectifiers
74
Assess the Locations of Peripheral Equipment
76
Choosing the User Interface Equipment
76
Choosing the Network Management Computer for a Passport 15000 or 20000
77
Deciding Where to Place a Sparing or a Fanout Panel
78
Deciding Where to Place Local User Interface Equipment
78
Deciding Where to Place Interworking Equipment
80
Interworking with an Edgelink 100
80
Deciding Which External BIP Alarms to Connect
82
Interworking with a Shasta 5000
82
Assess Spare Parts Storage and Selection
83
Using a Connection to a Gigabit Ethernet Port on NTHW84
83
Spare Cooling Units or Cooling Unit Parts
84
Spare Processor Cards
84
Assess Timing Requirements
85
Kits of Spare Parts for a Passport 15000 or 20000
85
Plan for the Use of an Equivalent Mounting Apparatus
87
Dimensions and Weight Rating for the Alternate Rack
88
Rack and Cabinet Specifications
88
Cooling Considerations
91
Electromagnetic Compatibilities for an Alternative Mounting Apparatus
91
Grounding the Switch Hardware
93
Preparing Your Site's Source of Power
93
Site Preparation
95
Task Flow Navigation
95
Task Flow of Site Preparation
95
Before You Begin
96
Safety Precautions
96
Tools and Equipment Required
96
Using the NEBS Floor Template
97
Raised Floor Openings for Processor Cables
99
Preparing the Floor for Anchor Holes
101
Task Flow of Preparing the Floor
101
Checking the Floor
104
Common Procedure Used for Drilling any Floor
105
When Adding a Door to a NEBS 2000 Frame
111
When Adding Extended Cable Management Brackets to a NEBS 2000 Frame
111
Marking the Footprint and the Anchor Holes on the Floor
112
Table 20 Frame Anchoring Kits
115
When Anchoring NEBS 2000 Frames Side-By-Side
116
When Anchoring Ac Rectifiers Near a Passport
118
Power and Grounding Preparation
119
Power Architecture
120
Passport 15000-VSS Power Architecture
121
Power Requirements
121
Power Input through Tapping a Main
122
Redundant Power Feeds
122
Power Input from a System of Ac Rectifiers
123
Passport 15000-VSS Power Requirements
125
Power Distribution and Consumption
125
Table 21 Power Consumption for Hardware Parts for a Passport 15000 or 20000
127
Sample Calculation of Maximum Input Current
130
Passport 15000-VSS Power Distribution
131
Preparation for Installing Power and Ground Cables
131
Allowing for Voltage Drop over Distance
133
About Restricted and Non-Restricted Sites
135
Table 22 Power Feed Sizes
135
Labeling the Power Feeds in CPE or a CO
136
Grounding the Frame in CPE or a CO
138
Grounding When Not Using a NEBS 2000 Frame
141
Grounding When Using Ac Rectifiers as a Power Source
141
Prerequisites to Installing DC Power Input Cables
141
Power Cable Specifications
143
Power Cable Specifications for a Fully Provisioned Shelf
144
Power Cable Specifications for a Partially Provisioned Shelf
146
Power Cable Specifications with a Polyvalent Assembly
147
Power Cable Specifications with an ETSI Assembly
149
Power Cable Specifications When Using Ac Rectifiers
152
Grounding Topologies
153
Power and Ground Cabling Overview
153
General Grounding Rules for IBN and CBN Topologies
156
Grounding a Passport
157
Grounding the Communication Links
157
Grounding the Frame and Communication Links
157
Standards and Compliance Considerations
159
Product Safety/Regulatory
160
Grounding Standards
161
Powering Standards
161
Electrical Fast Transient
162
Electromagnetic Compatibilities
162
Electromagnetic Emissions
162
Electrostatic Discharge (ESD)
162
Acoustic Noise Compliance
163
Electromagnetic Immunity (EMI)
163
Interconnect Compliance
163
Material and Manufacturing
163
Other Standards
163
Quality Compliance
163
Astec MFA150 Standards and Compliances
164
Appendix Grounding Topologies
165
Advertisement
Nortel 20000 Terminology (152 pages)
Multiservice Switch
Brand:
Nortel
| Category:
Switch
| Size: 1.94 MB
Table of Contents
Component Model
32
Internet Protocol Interface over Virtual Circuit (IPIVC)
67
NN10600-005 7.2S1 Standard PCR7.2 and up March
78
Network Management Interface (NMIF)
88
Secure Shell (Ssh)
118
Advertisement
Related Products
Nortel 2000 Series
Nortel 2380
Nortel 2550T
Nortel BayStack 380 model 24T
Nortel Versalar 25000
Nortel 2526T-PWR
Nortel 2216
Nortel 2424
Nortel 2208
Nortel 2370
Nortel Categories
IP Phone
Telephone
Switch
Software
Server
More Nortel Manuals
Login
Sign In
OR
Sign in with Facebook
Sign in with Google
Upload manual
Upload from disk
Upload from URL