Acura 1994 Integra Service Manual page 648

Hide thumbs Also See for 1994 Integra:
Table of Contents

Advertisement

Flow Gontrol Valve Installation
1. Apply steering grease (Honda P/N 08733 - B070E) to
new O-rings.
2. Coat the flow control valve with clean power steer-
i n g f l u i d .
3.
Install the flow control valve, spring and control
valve cover on the pump housing.
4. Tighten the three control cover bolts.
FLOW CONTROL
VALVE
SPRING
E;W
11 N.m {1.1 kgl.m,8lbtftl
2
Pulley Installation
1. Hold the steering pump in a vise with soft jaws.
CAUTION: Be careful not to damago the pump
hou3ing with the laws ol th€ vise.
2.
Install the pump pulley as shown. Then install the
pulley nut.
Hold the pulley with the special tool and tighten the
pulley nut.
PULLEY NUT
6ir N.m (6.5 kgt.m,47 lbt tt)
Check that the pump turns smoothly by turning the
pulrey.
PULLEY NUT
PULLEY
17-43

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents