Acura 1994 Integra Service Manual page 553

Hide thumbs Also See for 1994 Integra:
Table of Contents

Advertisement

7 . Remove the transmission jack.
Attach the torque converter to the drive plate with
eight bolts and torque:
Rotate the crankshatt as necessary to tighten the
bolts to 1/2 of the specilied torque, then to the final
toaque, rn a cnsscross pattern.
After tighten the last bolts, check that the crankshaft
rotates freely.
T O R O U E : 1 2 N . m { 1 . 2 k g l . m . 8 . 7 l b f . f t }
Install the torque converte. cove. and engine
stiffener.
L
9 .
6 r 1 . O m m
12 N.m 11.2 kgt.m, 8.7 lbl.ltl
1 0 .
1 2 N . m 1 1 . 2 k g f . m ,
8.7 rbt.ft)
Tighten the crankshaft pulley bolt to specified
rorque.
TOROUE: 177 N.m {18.O kgt.m, 130 lbf'ft}
1 0 x 1 . 2 5 m m
44 N'm {4.5 kgf.m.
33 rbt'frl
8 x '1.25 mm
24 N.m (2.4 kgl.m,
17 tbf.trl
l O x ' 1 . 2 5 m m
43 N.m
14.4 kgf.m, 32 lbf.ltl
11. Connect the ATF cooler hoses to the joint pipes.
12. Connect the throttle control cable to the throttle con-
trol lever and install the right front mount/bracket.
THROTTLE CONTROL LEVER
THROTTLE CONTROL
CABLE END
JOINT PIPES
1 2 x 1 . 2 5 m m
64 N.m {6.5 kgf.m,
47 tbf.ftl
Replace.
ATF COOLER HOSES
1 0 x 1 . 2 5 m m
R I G H T
44 N.m (4.5 kgf'm, FRONT
33 rbl.ftl
MoUNT/
BRACK€T
t 5 .
Install the control lever with a new lock washer to
the control shalt. then install the shift cable cover.
CAUTION: Take care not to bend the shift cable.
CONTROL
SHAFT
SHIFT CABLE
CONTROL LEVER
6 x 1 . 0 m m
1 2 N . m
{ 1 . 2 k g f . m ,
8.7 lbl.rr)
SHIFT CABLE
COVER
LOCK
6 x 1 . 0 m m
1 4 N . m 1 1 . 4 k g l . m ,
10 lbf.fr)
(cont'dl
Replace.
ASHER
1 4 - 1 6 5

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents