Installing the power supply and disk/tape unit

(Application Module)
The Application Module power supply and disk/tape units are packaged
separately for protection during shipping. Both units should be installed in
the Application Module after it has been installed in the AEM and before
external equipment is cabled to the Application Module.
1
Install the power supply and the disk tape unit in the Application
Module as follows:
¥
Make sure the associated circuit breaker on the Module Power
Distribution Unit (MPDU) is set to OFF (the down position). As
illustrated in Figure 31, the top breaker powers the module next
to the MPDU (on the left side as you face the AEM), and the
bottom breaker powers the module on the right-side.
¥
Gripping the handle at the front of the power supply faceplate,
line up the power supply with the guides at the top and bottom of
the module.
¥
Slowly slide the power supply into the module until the faceplate
is flush with the front of the module.
¥
Tighten the two screws at the top and bottom of the power
supply faceplate.
Figure 31
Module Power Distribution Unit breakers
Meridian Link Release 5C/CCR Release 3C Installation and Upgrade Guide
Chapter 8: Hardware installation procedures 127
Module Power
Distribution Unit
(MPDU)
Breaker for
left-side
Application Module
Breaker for
right-side
Application Module
¥
¥
¥

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Meridian link

Table of Contents