Removing The Cable Management Bracket From An Ex9214 Switch; Figure 74: Installing The Cable Management Bracket In An Ex9214 Switch - Juniper EX9214 Hardware Manual

Hide thumbs Also See for EX9214:
Table of Contents

Advertisement

EX9214 Switch Hardware Guide
Related
Documentation

Removing the Cable Management Bracket from an EX9214 Switch

228

Figure 74: Installing the Cable Management Bracket in an EX9214 Switch

Removing the Cable Management Bracket from an EX9214 Switch on page 228
Cable Management Bracket in an EX9214 Switch on page 35
The cable management bracket is installed below the line card and SF module slots on
the front panel.
Before you remove a cable management bracket from the switch:
Ensure you understand how to prevent Electrostatic discharge (ESD) damage. See
"Prevention of Electrostatic Discharge Damage" on page
Ensure that you have the following parts and tools available:
ESD grounding strap
7/16 in. (11 mm) nut driver
305.
Copyright © 2015, Juniper Networks, Inc.

Advertisement

Table of Contents
loading

Table of Contents