Maintaining The Ex9214 Cable Management Bracket; Removing The Cable Management Bracket From An Ex9214 Switch - Juniper EX9214 Hardware Manual

Hide thumbs Also See for EX9214:
Table of Contents

Advertisement

1. Use the appropriate screwdriver to remove the mounting screws that attach the chassis front-
mounting brackets to the rack or cabinet.
2. Move the lift to the rack and position it so that its platform is centered about 0.5 in. (1.27 cm) below
the bottom of the switch chassis and as close to it as possible.
3. Carefully slide the switch from the adjustable mounting brackets attached to the rack onto the lift.
4. Use the lift to transport the switch to its new location.

Maintaining the EX9214 Cable Management Bracket

IN THIS SECTION

Removing the Cable Management Bracket from an EX9214 Switch | 279

Installing the Cable Management Bracket in an EX9214 Switch | 281
Removing the Cable Management Bracket from an EX9214 Switch
Before you remove a cable management bracket from the switch:
• Ensure you understand how to prevent Electrostatic discharge (ESD) damage. See
Electrostatic Discharge Damage
Ensure that you have the following parts and tools available:
• ESD grounding strap
• 7/16 in. (11 mm) nut driver
The cable management bracket is installed below the line card and SF module slots on the front panel.
To remove the cable management bracket:
1. Attach an ESD grounding strap to your bare wrist and connect the strap to one of the ESD points on
the chassis.
.
279
Prevention of

Advertisement

Table of Contents
loading

Table of Contents