Powering On The Switch; Completing The Ex9200-Sf2 Upgrade - Juniper EX9214 Hardware Manual

Hide thumbs Also See for EX9214:
Table of Contents

Advertisement

Powering On the Switch

Completing the EX9200-SF2 Upgrade

Copyright © 2015, Juniper Networks, Inc.
Carefully align the sides of the Routing Engine with the guides inside the opening on
4.
the SCBE2.
Slide the Routing Engine into the EX9200-SF2 until you feel resistance, and then press
5.
the faceplate of the Routing Engine until it engages the connectors.
Press both of the ejector handles inward to seat the Routing Engine.
6.
Tighten the captive screws on the top and bottom of the Routing Engine.
7.
Connect the management device cables to the Routing Engine.
8.
See
"Powering On an AC-Powered EX9200 Switch" on page 148
DC-Powered EX9200 Switch" on page
To complete the upgrade procedure:
Verify that the installation is successful and the EX9200-SF2 is online by issuing the
1.
show chassis environment cb
user@switch> show chassis environment cb 0
CB 0 status
State
Online
Temperature 30 degrees C / 86 degrees F
...
user@switch> show chassis environment cb 1
CB 1 status
State
Online
Temperature 30 degrees C / 86 degrees F
...
Other details, such as, temperature, power, etc are also displayed along with the state.
Verify that the fabric planes come online correctly by issuing the
2.
command:
summary
user@switch> show chassis fabric summary
Plane
State
Uptime
0
Online
2 days, 19 hours, 10 minutes, 9 seconds
1
Online
2 days, 19 hours, 10 minutes, 9 seconds
...
Verify that the backup Routing Engine is back online by issuing the
3.
routing-engine 1
command:
user@switch> show chassis routing-engine 1
Routing Engine Status:
Slot 1:
Current State
Backup
...
Verify that the EX9200-SF2s appear in output from the
4.
command:
user@switch> show chassis hardware
Chapter 19: Upgrading and Replacing Switch Fabric (SF) Module
153.
command:
or
"Powering On a
show chassis fabric
show chassis
show chassis hardware
199

Advertisement

Table of Contents
loading

Table of Contents