Replacing Cable Management Bracket; Installing The Cable Management Bracket In An Ex9214 Switch - Juniper EX9214 Hardware Manual

Hide thumbs Also See for EX9214:
Table of Contents

Advertisement

CHAPTER 24

Replacing Cable Management Bracket

Installing the Cable Management Bracket in an EX9214 Switch

Copyright © 2015, Juniper Networks, Inc.
Installing the Cable Management Bracket in an EX9214 Switch on page 227
Removing the Cable Management Bracket from an EX9214 Switch on page 228
You can install the cable management bracket below the line card and SF module slots
on the front panel.
Before you install a cable management bracket in the switch:
Ensure you understand how to prevent Electrostatic discharge (ESD) damage. See
"Prevention of Electrostatic Discharge Damage" on page
Ensure that you have the following parts and tools available:
ESD grounding strap
7/16 in. (11 mm) nut driver
To install the cable management bracket:
Attach the ESD grounding strap to your bare wrist and connect the strap to the ESD
1.
point on the chassis.
Position the cable management bracket on the studs on the lower part of the front
2.
panel. See
Figure 74 on page
Insert the nuts on the corners in the cable management bracket into the studs on the
3.
chassis.
Tighten the captive screws using a 7/16 in. (11 mm) nut driver.
4.
228.
305.
227

Advertisement

Table of Contents
loading

Table of Contents