Suzuki Wagon R Manual page 3841

Hide thumbs Also See for Wagon R:
Table of Contents

Advertisement

6A4-14 ENGINE MECHANICAL (Z10XEP AND Z12XEP ENGINES)
1
Installation
1) Clean sealing surfaces of intake manifold.
2) Install twinport vacuum unit.
3) Install fuel distributor pipe.
Tightening torque
Fuel distributor pipe: 6 N·m (0.6 kg-m, 4.5 lb-ft)
4) Install ECM.
5) Install intake manifold with new seal rings (1).
Tightening torque
Intake manifold bolt (a): 9 N·m (0.9 kg-m, 7.0 lb-ft)
6) Install EGR pipe with new gasket.
Tightening torque
EGR pipe bolt
(a): 8 N·m (0.8 kg-m, 6.0 lb-ft)
7) Install wiring harness bracket (1).
Tightening torque
Wiring harness bracket bolt
(a): 20 N·m (2.0 kg-m, 14.5 lb-ft)
8) Install tank vent valve.
(a)
Tighten intake manifold bolts to specified torque.
Tighten EGR pipe bolts to specified torque.

Hide quick links:

Advertisement

Chapters

Table of Contents
loading

Table of Contents