Panasonic FP7 User Manual page 201

Positioning unit
Hide thumbs Also See for FP7:
Table of Contents

Advertisement

Contact
Target axis
allocation
X70
|
X7F
X80
1st axis
X81
2nd axis
X82
3rd axis
X83
4th axis
X84
|
X87
X88
1st axis
X89
2nd axis
X8A
3rd axis
X8B
4th axis
X8C
|
X8F
X90
1st axis
X91
2nd axis
X92
3rd axis
X93
4th axis
X94
|
X97
X98
1st axis
X99
2nd axis
X9A
3rd axis
X9B
4th axis
X9C
|
X9F
X100
|
X10F
X110
|
X11F
Phone: 800.894.0412 - Fax: 888.723.4773 - Web: www.clrwtr.com - Email: info@clrwtr.com
Name
Make synchronous settings in the unit with the synchronous setting
request contact (Y80 to Y83) turned ON after making synchronous
Synchronous
setting done
setting changes with the program. The contact turns ON upon
completion of the setting changes.
Turns ON when the synchronous operation of the positioning unit is
canceled with the synchronous setting cancel request contact (Y88 to
Synchronous
Y8B) turned ON.
cancel alarm
The synchronous operation of axes cannot be executed if this contact is
ON for the axes.
Makes gear ratio changes with the salve axis gear ratio change request
Slave axis
contact (Y90 to Y93)
gear ratio
The contact for the corresponding axis will turn ON after the gear ratio is
change notice
changed.
The clutch will start operating when the slave axis clutch ON re-request
contact (Y98 to Y9B) or clutch OFF request contacts (Y100 to 103) turn
Slave axis
ON.
clutch operation
notice
The contact for the corresponding axis will turn ON after completion of
the operation of the clutch.
17.2 I/O Number Allocation
Description
17-9

Advertisement

Table of Contents
loading

Table of Contents