To Replace An Intuvo Gc Column - Agilent Technologies 5977B Series Operating Manual

Msd
Hide thumbs Also See for 5977B Series:
Table of Contents

Advertisement

To Replace an Intuvo GC Column

This procedure applies to GCs with a single column. For a 2 column
replacement see the Agilent Intuvo 9000 Gas Chromatograph Maintaining
Your GC manual.
Materials needed
• Gloves, clean, lint-free (Large 8650-0030) (Small 8650-0029)
• Tweezers (8710-2460)
• Intuvo gasket, polyimide 5/pk, for temperatures < 350 °C (5190-9072)
• Intuvo gasket, nickel 5/pk, for temperatures 350 °C to 450 °C (5190-9073)
• Intuvo torque driver stored on oven door (5190-9571)
Procedure
The inlet, detector, bus components, and column can be hot enough to cause burns.
WA R N I N G
Cool heated zones to a safe handling temperature before continuing.
Always wear clean gloves while handling any parts that are in the flow path going to
C A U T I O N
the analyzer or parts that are located inside the analyzer.
1
2
3
5977B Series MSD Operating Manual
Prepare the GC for maintenance. 
From the GC panel select Maintenance > Column > Perform Maintenance >
Install Column > Start Maintenance. This procedure cools the inlet, detector,
column, Guard Chip, and other components in the flow path heated zones
to < 40 °C and configures the GC. Follow the on-screen GC prompts.
From MassHunter Data Acquisition, Vent the MS (See
on page 113.)
If you are using hydrogen or other flammable gas as a carrier gas, close the
manual gas supply valve to the instrument before turning off the MS
power.
Intuvo 9000 GC Column Maintenance
"To Vent the MSD"
3
61

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

5975 msd5977 msd

Table of Contents