Agilent Technologies 5977B Series Operating Manual page 43

Msd
Hide thumbs Also See for 5977B Series:
Table of Contents

Advertisement

Procedure
Always wear clean gloves while handling any parts that go inside the GC or the
C A U T I O N
analyzer chambers.
The analyzer, GC/MS interface, and other components in the analyzer chamber
WA R N I N G
operate at very high temperatures. Do not touch any part until you are sure it is cool.
1 Condition the column. (See
Dangerous voltages exist inside the analyzer chamber, which can result in fatal
WA R N I N G
injury. Do not open the analyzer chamber door for any reason. If access is required,
trained service personnel must first disconnect the instrument from the building
power source.
2 Vent the MSD and open the analyzer chamber. (See
The GC operates under high temperatures. Do not touch any GC parts until you are
WA R N I N G
certain they are cool.
3 If installed, remove the isolation tip from the end of the GC/MS interface.
4 Slide an interface nut and conditioned ferrule onto the free end of the GC
5 Slide the column into the GC/MS interface.
6 Use the column cutter to score the column 2 cm from its end.
7 While holding the column against the column cutter with your thumb, break
8 Inspect the end for jagged edges or burrs. If the break is not clean and even,
9 Wipe the end with alcohol.
5977B Series MSD Operating Manual
page 113 and
"To Open the Analyzer Chamber"
can see the end of the GC/MS interface.
column. The tapered end of the ferrule must point towards the nut.
the column against the edge of the column cutter.
repeat steps 6 and 7.
Installing 7890 GC Columns
"To Condition a Capillary Column"
on page 152.) Be sure you
on page 41.)
"To Vent the MSD"
on
2
43

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

5975 msd5977 msd

Table of Contents