Agilent Technologies 5977B Series Operating Manual page 71

Msd
Hide thumbs Also See for 5977B Series:
Table of Contents

Advertisement

3
4
5
6
7
8
9
Thumb screw
MS tail heater assembly clamp
Compression bolts
Figure 15
10 Open the MS tail heater assembly by loosening the thumb screw at the top
5977B Series MSD Operating Manual
Wait until the GC reaches the ready state indicating the components are
cooled below 40 °C before continuing the steps in this procedure.
Open the analyzer chamber. (See
page 152.)
Unscrew the tip seal from the tip seal holder and remove the tip seal and
spring from the GC/MS interface. (See
Ensure the MS is properly aligned with the GC. If the GC/MS is not
properly aligned, the transfer line clamp screw will be difficult to tighten.
Open the GC front door.
Open the bus door and remove it by lifting the door vertically off its hinge
pins.
Using the Intuvo torque driver, remove the compression bolt that secures
the 9000 GC/MS Tail click and run bus connection. Also remove the bolt
from the empty bus connection.
MS tail heater assembly clamp closed
of the clamp and rotating the clamp down.
Intuvo 9000 GC Column Maintenance
"To Open the Analyzer Chamber"
"Interface tip seal"
3
on
on page 76.)
71

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

5975 msd5977 msd

Table of Contents