Main Shaft Gear Train Disassembly (T-15A) - Jeep 1979 CJ-5 Technical & Service Manual

Table of Contents

Advertisement

2B-14
MANUAL TRANSMISSION
4 2 5 8 1
Fig. 21=1 i
Front Bearing Removal
Fig. 21-20 tar Bearing Removal
(14) Remove countershaft gear thrust washers from
case.
(15) Remove arbor tool, spacer washers, bearing roll-
ers and center spacer from countershaft gear.
(16) Remove reverse idler gear shaft using tool J-
25203 (fig. 2B-22).
(17) Remove reverse idler gear, thrust washers, and
roller bearings as assembly.
G E A R
4 2 5 8 6
Fig. 2B-22
Reverse Idler Gear Removal/Installation
Main Shaft Gear Train Disassembly
(1) Remove second-third synchronizer
retaining
snap ring and remove synchronizer assembly (fig. 2B-
23).
(2) Remove second gear and blocking ring.
(3) Remove reverse gear.
Fig. 2B-21 Countershaft Removal/Installation
Fig. 2B-23
Second-Third Clutch Hub Snap Ring Removal/Installation

Advertisement

Table of Contents
loading

Table of Contents