Connect Two Cooling Hose Ends (Pedestal-To-Head) - Christie CP2000 Setup Manual

Christie cp2000 digital cinema projector setup guide
Hide thumbs Also See for CP2000:
Table of Contents

Advertisement

IMPORTANT! Ball joint must move freely. If necessary, hand tighten
with 9/64" Allen key.
• With 3/16" Allen key, secure the NEGATIVE (-) BLACK lamp lead
and the two igniter harnesses to the side of the connector nut (Figure
2-13 Secure Lamp Lead and 2 Igniter Wires).
IMPORTANT! Secure lamp lead FIRST on connector, then remaining
two igniter wires on TOP.
At this point, the lamp pre-wiring is complete. Leave lamp accessible
for now.

CONNECT TWO COOLING HOSE ENDS (PEDESTAL-TO-HEAD)

During operation, a closed loop of flexible tubing circulates cooling liquid stored in the pedestal to
critical electronic components located in the front compartment of the projection head (Figure 2-14
Liquid Cooling Loop). Looking into the pedestal, the liquid will circulate counterclockwise.
CP2000 Setup Guide
020-100070-01 Rev. 1 (10/08)
F
2-14 L
C
IGURE
IQUID
OOLING
Section 2: Installation and Setup
F
2-13 S
IGURE
L
EAD AND
L
OOP
L
ECURE
AMP
2 I
W
GNITER
IRES
2-9