Christie CP2000 Setup Manual page 30

Christie cp2000 digital cinema projector setup guide
Hide thumbs Also See for CP2000:
Table of Contents

Advertisement

Section 2: Installation and Setup
1. Remove the pair of rack protector posts from the rear of the pedestal.
2. Remove the required horizontal rack covers (security plates).
3. Rack-mount the desired equipment within the pedestal.
4. Re-install the pair of rack protector posts. Keep extra covers.
Do not modify any CP wiring or lead dress during installation. Ensure the added device does not
interfere with normal CP operation.
• Power normally connects to the projector's internal outlet (208 VAC models) or is hard-wired to the
TB2 terminal block (400 VAC models).
NOTE: Internal power connection is not possible if incoming AC feed is 4-wire 3-phase only, as the
internal outlet or TB2 terminal has no power in this case.
F
F
IGURE
NOTE: The DVI ports are single-link ports for single-link cable/connectors only. Using as a dual-link
pair requires a special adapter (not currently available).
2-18
2-25 C
IGURE
ONNECTING AN
2-26 C
ONNECTING AN
I
C
S
NTERNAL
INEMA
ERVER
I
N
-
(DVI) S
NTERNAL
ON
CINEMA
/S
OURCE
OURCE
CP2000 Setup Guide
020-100070-01 Rev. 1 (10/08)

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents