2. Upon initial power up, your first supply of coolant
will drain into the hoses and fill them, leaving the
reservoir itself almost empty. Using Christie's 50/50
mix of distilled water and ethylene glycol, re-fill
the reservoir until the level is close to but not above
the top mark on the gauge located on the outside of
the pedestal door (Figure 2-32). If you over-fill,
remove the reservoir from the pedestal and pour out
excess. Refer back to Figure 2-16 Fill Reservoir.
3. Turn all projector breakers OFF, then ON again to
clear air from lines.
4. Check for airlock in cooling system. After any final
filling or topping up of the coolant reservoir, make sure the hose between the reservoir to the pump
is completely full upon the next power-up (Figure 2-33).
If the hose is not full: This signifies the presence of an airlock that can interfere with proper
circulation of the liquid throughout the projector. Turn the projector OFF then ON once again. The
hose should now be completely filled.
5. Check that fans are running and interlocks are OK
6. At the TPC, go to the Admin:Lamp menu (password required). Enter the size of the lamp
currently installed in the projector (factory default should be 2.0 kW).
7. At the main menu of the TPC, press the Lamp button. The lamp should ignite.
CP2000 Setup Guide
020-100070-01 Rev. 1 (10/08)
F
2-33 C
IGURE
HECK HOSE FOR AIRLOCK PROBLEM
Section 2: Installation and Setup
F
2-32 R
-
IGURE
E
FILL AND
C
L
HECK
EVEL