342-456 VAC (Europe, etc.):
• If 3-phase and single-phase feeds (6-wire):
• Ensure ground wire is connected directly to the frame ground lug on the pedestal floor.
Attach no other wires here.
• Connect L and N @ 200-230 VAC (single-phase)
• Connect 1, 2, and 3 @ 342-456 VAC (3-phase)
• If 3-phase with neutral fed from 3-phase (5-wire):
• Ensure ground wire is connected directly to the frame ground lug on the pedestal floor.
Attach no other wires here.
• Connect 1, 2, 3, and N @ 342-456 VAC (3-phase)
• No L available. Connect jumper from 1 to L.
• If 3-phase only (4-wire):
This configuration is not possible. Use 5-wire or 6-wire only. Neutral is required.
Ground (earth) connection is necessary for safety. Never compromise safety by
returning current through the ground.

SPECIAL ADJUSTMENTS FOR SOME AC SUPPLIES

AC levels can vary depending on region. Check the following when installing.
NOTES: 1) Requires voltmeter for up to 400 VAC. 2) Consult the Interconnect Drawing in pedestal.
Jumper from Igniter Terminal 2: As set from the factory, the igniter jumper located on terminal 2
connects to T2. This configuration is used when 207-265 VAC are present (as it is for most countries).
If you find your incoming AC is below 207 VAC, connect terminal 2 jumper to T1 instead.
CP2000 Setup Guide
020-100070-01 Rev. 1 (10/08)
WARNING
F
2-21 C
V
IGURE
HECK
OLTAGE AND
Section 2: Installation and Setup
P
J
OSITION
UMPERS
2-15

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents