Axis E100 User Manual page 146

Network cd-rom server
Table of Contents

Advertisement

Appendix D: Tower and Drive Installation
Note:
Connecting the
IDE Drives
Note:
146
4. Connect an external, preferably active, SCSI terminator to the last drive in the
SCSI chain. If there is only one drive, it is the last one in the chain and must
be terminated. The StorPoint CD has built-in SCSI termination which is
always switched on. Therefore, the server must be physically located at one end
of the chain. This is the case for both the single and dual SCSI versions.
Do not terminate the drives placed between the StorPoint CD and the last

drive.
5. Switch the power on to the whole of the tower.
6. The StorPoint CD front panel indicators will flash during power-on and self-
test. When the Status indicator stops flashing and turns solid green, the
StorPoint CD is ready for use.
To connect the IDE drives to the StorPoint CD, follow these steps:
1. Connect the IDE cable to the IDE connector on the StorPoint CD.
2. Connect the IDE cable to the drive(s).
3. Assign each of the connected drives to Master or Slave. Refer to the drive
documentation for instructions on how to set the device type for your drives.
The server must be physically located at one end of the cable.

4. Switch the power on to the whole of the tower.
5. The StorPoint CD front panel indicators will flash during power-on and self-
test. When the Status indicator stops flashing and turns solid green, the
StorPoint CD is ready for use.
AXIS StorPoint CD E100 User's Manual

Advertisement

Table of Contents
loading

This manual is also suitable for:

Storpoint cd e100

Table of Contents