Function modules
7.11 Parallel connection of chassis power units (vector)
Parallel connection of two Active Line Modules and two Motor Modules on a motor with a single
winding system
Figure 7-26
7.11.5

Commissioning

During commissioning, power units connected in parallel are treated like a power unit on the
line or motor side. With parallel connection, the parameter display for the actual values
changes only slightly. Instead, suitable "total values" are derived from the individual values
for the power units.
In STARTER, parallel connection (Line Modules and Motor Modules) is activated via the
Wizard. You can also select parallel connection when choosing the power unit. You then
have to specify the number of power units to be connected in parallel.
290
Example 2: parallel connection
Function Manual, (FH1), 07/2007 Edition, 6SL3097-2AB00-0BP4
Drive Functions

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents