Installing The Hardware; Required Equipment - 3Com 3C8S5007 - SuperStack II PathBuilder S500 Switch User Manual

User guide
Table of Contents

Advertisement

2
Required
Equipment
I
NSTALLING THE
This chapter describes how to install your PathBuilder switch.
Table 6 lists the items you receive in the shipping carton and items you
need to provide.
Table 6 Equipment Received and Equipment Needed
Shipping carton contents
What you need to provide
* The software is preinstalled in the flash memory drive of the switch and automatically loads
when you turn on the power. The software CD-ROM is for software recovery purposes only.
WARNING: To eliminate cable noise emission in excess of FCC
regulations, part 15, subpart J, and EN55022B, all interconnection cables
should be equipped with shielded connectors, the backshells of which
must completely surround the cable shield.
For more information on cables, see Appendix C.
H
ARDWARE
PathBuilder switch
Power cable
Rack-mount kit
Software CD-ROM
*
Documentation and documentation CD-ROM
Interface module (available from 3Com —
optional)
10BASE-T or 100BASE-TX network cables
Flex-WAN cables (available from 3Com). See
"Flex-WAN Serial Connectors and Serial Cables"
on page 90 for more information about ordering
Flex-WAN cables.
ATM cables — optical fiber for OC3 connectors or
75-ohm coaxial cables for Coax (DS3/E3)
connectors
Terminal, PC, or modem and cable

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the 3C8S5007 - SuperStack II PathBuilder S500 Switch and is the answer not in the manual?

Questions and answers

Table of Contents