Cisco 7600 SIP 200 - SPA Interface Processor 200 Hardware Installation Manual page 165

7600 series sip, ssc, and spa hardware installation guide
Table of Contents

Advertisement

Chapter 7
Troubleshooting the Installation
Two foam packing cushions
Use Cisco Systems original packaging for the shipment of all SIPs. Failure to properly use Cisco
Caution
Systems packaging can result in damage or loss of product.
Warning
During this procedure, wear grounding wrist straps to avoid ESD damage to the card. Do not directly
touch the backplane with your hand or any metal tool, or you could shock yourself. Statement 94
These instructions assume that the SIP has been removed from the router according to the recommended
Note
procedures specified in this guide.
To pack a SIP for shipment, follow these steps:
Insert the SIP into the static shielding bag.
Step 1
Insert the bagged SIP into the smaller inner carton. Be careful to position the SIP so that the bottom
Step 2
motherboard lip is held by the packaging cutout.
Close the smaller inner carton and tape the sides closed.
Step 3
Place the sealed smaller inner carton containing the SIP into the two foam packing cushions (they only
Step 4
fit one way).
Place the sealed smaller inner carton and packing cushions into the larger exterior carton, and seal the
Step 5
larger exterior carton with tape for shipment.
OL-5052-14
Cisco 7600 Series Router SIP, SSC, and SPA Hardware Installation Guide
Packing a SIP for Shipment
7-9

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

7600 sip-600Cisco 7600 ssc-4007600 sip-2007600 sip-400

Table of Contents