Spa Cable-Management Brackets - Cisco 7600 SIP 200 - SPA Interface Processor 200 Hardware Installation Manual

7600 series sip, ssc, and spa hardware installation guide
Table of Contents

Advertisement

Chapter 6
Installing and Removing a Shared Port Adapter

SPA Cable-Management Brackets

SPAs are shipped with an accessory kit that includes cable-management brackets.
cable-management brackets installed in a SPA, as well as cable routing.
Figure 6-3
To install cable-management brackets on a SPA, perform the following steps:
Step 1
Screw the two pull assemblies into both sides of the SPA.
Step 2
Insert the cable-management clip into the slot.
To remove the cable-management clip, depress the button on the clip and pull it out.
Step 3
Note
Blank filler plugs are provided if no cable-management clips are installed.
OL-5052-14
SPA Cable-Management Brackets
WS-X6 K-SUP 2-2GE
CONSO LE
PORT
MODE
CONSO LE
SUPER VISOR 2
PCMCIA
OSM-4O C12 POS-SI
4 PORT OC-12 POS SM
IR
7600-MS C-600
MODULA R
SERVICE S CARD
Switch
Load
100%
PORT 1
EJECT
1%
SPA-4XO C3-ATM
Cisco 7600 Series Router SIP, SSC, and SPA Hardware Installation Guide
SPA Cable-Management Brackets
Figure 6-3
PORT 2
shows
6-7

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

7600 sip-600Cisco 7600 ssc-4007600 sip-2007600 sip-400

Table of Contents