Virtual Router Operation; Domain Name System Dashboard - HP GbE2c - Blc Layer 2/3 Fiber SFP Option Interface Manual

Ethernet blade switch for c-class bladesystem browser-based interface reference guide
Hide thumbs Also See for GbE2c - Blc Layer 2/3 Fiber SFP Option:
Table of Contents

Advertisement

Virtual Router Operation

NOTE:
This form is available only on the GbE2c Layer 2/3 Ethernet Blade Switch.
To display the following form, go to the Virtual Routers Dashboard. Select a virtual router number.
The following table describes the Virtual Router Operation controls:
Table 42
Virtual Router Operation controls
Control
Set Virtual Router to Backup

Domain Name System Dashboard

To display the following form, select Layer 3 > Domain Name System.
This form summarizes DNS information.
Description
Forces the master virtual router into backup mode. This is generally used for
passing master control back to a preferred switch once the preferred switch
has been returned to service after a failure. When this command is executed,
the current master gives up control and initiates a new election by temporarily
advertising its own priority level as 0 (lowest). After the new election, the
virtual router forced into backup mode by this command will resume master
control in the following cases:
This switch owns the virtual router (the IP addresses of the virtual router
and its IP interface are the same)
This switch's virtual router has a higher priority and preemption is
enabled.
There are no other virtual routers available to take master control.
Dashboard 55

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the GbE2c - Blc Layer 2/3 Fiber SFP Option and is the answer not in the manual?

Subscribe to Our Youtube Channel

This manual is also suitable for:

Gbe2cXw460c - proliant - blade workstation

Table of Contents