Hardware Installation - Cisco 15454-TCC - Network Processor Card Operation Manual

Operation guide
Hide thumbs Also See for 15454-TCC - Network Processor Card:
Table of Contents

Advertisement

Hardware Installation

Reverse the Mounting Bracket to Fit a 19-Inch Rack
Mount the Shelf Assembly in a Rack (One Person)
Mount the Shelf Assembly in a Rack (Two People)
Mount Multiple Shelf Assemblies in a Rack
Open the Front Cabinet Compartment (Door)
Remove the Front Door
Remove the Backplane Sheet Metal Covers
Remove the Lower Backplane Cover
Install a BNC, High-Density BNC, or SMB EIA
Install the AMP Champ EIA
Install the Bottom Brackets and Air Filter
Install the Fan-Tray Assembly
Install Redundant Power Feeds
Install Alarm Wires on the Backplane
Install Timing Wires on the Backplane
Install LAN Wires on the Backplane
Install Craft Interface Wires on the Backplane
Install Coaxial Cable With BNC Connectors
Install Coaxial Cable With High-Density BNC Connectors
Install Coaxial Cable with SMB Connectors
Install DS-1 Cables Using Electrical Interface Adapters (Balun)
Install DS-1 AMP Champ Cables on the AMP Champ EIA
Install the TCC+ and XC/XCVT/XC10G Cards
Install Optical, Electrical, and Ethernet Cards
Install the AIC Card
Install Gigabit Interface Converters
Remove a Gigabit Interface Converter
Install Fiber-Optic Cables on OC-N Cards
Install the Fiber Boot
Route Fiber-Optic Cables in the Shelf Assembly
November 2001
1-9
1-12
1-13
1-15
1-16
1-22
1-24
1-26
1-27
1-30
1-33
1-34
1-35
1-36
1-36
1-38
1-47
1-48
1-49
1-50
1-52
1-53
1-53
1-56
P R O C E D U R E S
1-7
1-8
1-9
1-38
1-40
1-43
Cisco ONS 15454 Installation and Operations Guide
xxvii

Advertisement

Table of Contents
loading

Table of Contents