Figure 9-13 Viewing A Span - Cisco 15454-TCC - Network Processor Card Operation Manual

Operation guide
Hide thumbs Also See for 15454-TCC - Network Processor Card:
Table of Contents

Advertisement

Chapter 9
Ethernet Operation
Click the green span leading to the next node.
Step 27
The span turns white.
Step 28
Click Add Span.
The span turns blue.
Step 29
Repeat Steps 24 – 27 for every node remaining in the ring.
dialog box with all the spans selected.

Figure 9-13 Viewing a span

Verify that the new circuit is correctly configured.
Step 30
Note
Click Finish.
Step 31
You now need to provision the Ethernet ports and assign ports to VLANs. For port provisioning
Step 32
instructions, see the
see the
November 2001
If the circuit information is not correct, click the Back button and repeat the procedure with
the correct information. You can also click Finish, delete the completed circuit, and begin
the procedure again.
"Provision Ethernet Ports" procedure on page
"Provision Ethernet Ports for VLAN Membership" procedure on page
Ethernet Circuit Configurations
Figure 9-13 shows the Circuit Path Selection
9-3. For assigning ports to VLANs,
Cisco ONS 15454 Installation and Operations Guide
9-24.
9-13

Advertisement

Table of Contents
loading

Table of Contents