Chapter 1
Hardware Installation
•
•
1.16.14 Power Specifications
•
•
•
•
1.16.15 Environmental Specifications
•
•
1.16.16 Dimensions
•
•
•
•
1.17 Installation Checklist
This section provides a summary of the steps required to install the ONS 15454. The section assumes
that individual cards are used with their default provisioning values or will be provisioned by local
technicians as required by the site.
Table 1-11 Installation Checklist
Description
The ONS 15454 is mounted securely in the rack.
The ONS 15454 is grounded with the frame ground.
Power runs to the ONS 15454.
Visual and Audible alarm pins connect to central alarm collection equipment.
If used, BITS, LAN, Alarm, ACO, and CRAFT pins connect to corresponding cables.
If used, BITS, LAN, Alarm, ACO, and CRAFT cables are tiewrapped and routed under
screw holes.
The preferred EIAs are installed.
Coaxial and/or DS-1 cables are installed on the backplane.
Laced or tiewrapped coaxial cables run onto the sides of the ONS 15454.
November 2001
Holdover Stability: 3.7 x10
Reference: External BITS, line, internal
Input power: -48 VDC
Power consumption: 55W (fan tray only); 650W (maximum draw w/cards)
Power Requirements: -42 to -57 VDC
Power terminals: #6 Lug
Operating Temperature: 0 to +55 degrees Celsius
Operating Humidity: 5 - 95%, non-condensing
Height: 18.5 inches (40.7 cm)
Width: 19 or 23 inches (41.8 or 50.6 cm) with mounting ears attached
Depth: 12 inches (26.4 cm) (5 inch projection from rack)
Weight: 55 lbs. (empty)
-7
/day, including temperature (< 255 slips in first 24 hours)
Cisco ONS 15454 Installation and Operations Guide
Installation Checklist