3.
Remove all power:
a. Disconnect each power cord from the power source.
b. Disconnect each power cord from the server.
4.
Disconnect all peripheral cables from the server.
5.
Do one of the following:
Extend the server from the rack.
•
Remove the server from the rack.
•
6.
Remove the access panel.
7.
Remove the primary riser cage.
8.
Remove the FlexibleLOM blank.
9.
Install the FlexibleLOM adapter.
Hardware options installation
91