HPE ProLiant DL180 Gen10 User Manual page 56

Hide thumbs Also See for ProLiant DL180 Gen10:
Table of Contents

Advertisement

5.
Do one of the following:
Extend the server from the rack.
Remove the server from the rack.
6.
Remove the access panel.
7.
Remove the air baffle.
8.
Remove the 8-bay SFF drive box blank.
9.
Install the 8-bay SFF drive cage.
10. Connect the Mini-SAS cables.
11. Install the drives.
12. Disconnect the existing power cable.
13. Connect the power cable.
Hardware options installation
56

Advertisement

Table of Contents
loading

Table of Contents