12. If internal cables are required for the expansion board, connect the cables.
13. If removed, install the air baffle.
14. Install the riser cage.
15. Connect all cables to system board/backplane.
16. Install the access panel.
17. Install the server into the rack.
18. Connect all peripheral cables to the server.
19. Connect each power cord to the server.
20. Connect each power cord to the power source.
21. Power up the server.
The installation is complete.
Installing the FlexibleLOM adapter
Prerequisites
Before you perform this procedure, make sure that you have the following items available:
•
T-15 Torx screwdriver
•
T-10 Torx screwdriver
•
FlexibleLOM riser cage
Procedure
1.
If installed, remove the front bezel.
2.
Power down the server.
Hardware options installation