a. Disconnect each power cord from the power source.
b. Disconnect each power cord from the server.
4.
Disconnect all peripheral cables from the server.
5.
Do one of the following:
•
Extend the server from the rack.
•
Remove the server from the rack.
6.
Remove the access panel.
7.
Remove the air baffle.
8.
Remove the 8-bay SFF drive box blank from box 1.
9.
Install the optical drive.
a. Remove the optical drive blank.
b. Install the optical drive into the cage.
Hardware options installation
67