Operations; Power Up The Server; Power Down The Server; Extending The Server From The Rack - HPE ProLiant DL180 Gen10 User Manual

Hide thumbs Also See for ProLiant DL180 Gen10:
Table of Contents

Advertisement

Operations

Power up the server

Procedure
1. To power up the server, use one of the following methods:
Press the Power On/Standby button.
Use the virtual power button through iLO.

Power down the server

Before powering down the server for any upgrade or maintenance procedures, perform a backup of critical server data
and programs.
IMPORTANT: When the server is in standby mode, auxiliary power is still being provided to the system.
To power down the server, use one of the following methods:
Press and release the Power On/Standby button.
This method initiates a controlled shutdown of applications and the OS before the server enters standby mode.
Press and hold the Power On/Standby button for more than 4 seconds to force the server to enter standby mode.
This method forces the server to enter standby mode without properly exiting applications and the OS. If an
application stops responding, you can use this method to force a shutdown.
Use a virtual power button selection through iLO 5 .
This method initiates a controlled remote shutdown of applications and the OS before the server enters standby
mode.
Before proceeding, verify that the server is in standby mode by observing that the system power LED is amber.

Extending the server from the rack

WARNING: To reduce the risk of personal injury or equipment damage, be sure that the rack is adequately
stabilized before extending a component from the rack.
Prerequisites
T-25 Torx screwdriver
Procedure
1. If the rear panel cables are not secured with a cable management arm, do the following:
28
Operations

Advertisement

Table of Contents
loading

Table of Contents