Siemens SINAMICS G120C Operating Instructions Manual page 54

Low voltage converters
Hide thumbs Also See for SINAMICS G120C:
Table of Contents

Advertisement

Installing
4.4 Mounting the converter
 
Depth
Additional depth with opera‐
tor panel (OP) attached
The upper shield plate is optionally available
1)
Mounting the shield plates, FSAA ... FSC
We recommend that you mount the shield plates provided. The shield plates make it simpler to
install the converter in compliance with EMC regulations and to provide strength relief for the
connected cables.
Figure 4-16
Mounting the shield plate and EMC connecting bracket, FSD ... FSE
Procedure
1. If you are using a converter with an integrated line filter, then mount the EMC connecting
bracket on the shield plate
On converters without a filter, the EMC connecting bracket is not included in the scope of
supply of the converter.
2. Then slide the shield module into the converter, so that it is held in the converter
clamping spring. The shield module is located correctly if it can be easily withdrawn from the
converter without any resistance.
3. After you have ensured that it is correctly located, fix the shield module using the four
screws
52
Frame size D
22 kW ... 45 kW
237 mm
+ 11 mm with inserted BOP‑2 (Basic Operator Panel) or IOP‑2 (Intelligent
Operator Panel)
Mounting the shield plates, FSAA ... FSC
.
.
Frame size E
55 kW
237 mm
Operating Instructions, 02/2023, FW V4.7 SP14, A5E34263257B AK
Frame size F
75 kW ... 132 kW
357 mm
by the
SINAMICS G120C Converters

Advertisement

Table of Contents
loading

This manual is also suitable for:

Sinamics g120c uss/mbSinamics g120c dpSinamics g120c pn

Table of Contents