Conversion Of Electricity Supply (1*0Bm2E); Testing Of The Appliance - Angelo Po 0N0BM1E User Manual

Electric bain-marie
Table of Contents

Advertisement

Available languages
  • EN

Available languages

  • ENGLISH, page 25
HANDLING AND INSTALLATION

CONVERSION OF ELECTRICITY SUPPLY (1*0BM2E)

NOTE: The appliance is supplied at an
operating voltage 400V/3N (indicated on
the sticker applied to the dataplate); con-
version to 230V/3, can be carried out as de-
scribed below.
HAZARD: Before doing any work, turn
off the general power supply.
Pull off the knob (A).
1)
Take out the screws (B) and take down the
2)
dashboard (C).
Modify the connections to the heating ele-
3)
ment terminals (D) as shown in the electrical
system diagram at the back of the manual.
Replace the control panel (C) on completion
4)
of the operation.
Remove the test voltage indicator sticker
5)
from the dataplate and apply the new one to
identify the voltage being used.
NOTE: After completing the opera-
tion, check for any faults.
WARNING: Before commissioning the
appliance, the system must be tested to as-
sess the operating conditions of every sin-
gle component and detect any anomalies.
In this stage, it is important to check that all
health and safety requirements are strictly
adhered
to.
The following checks should be carried out to
test the system:
Check that the mains voltage is the same as
1)
that of the appliance.
3319950_inst_GB_rev.3

TESTING OF THE APPLIANCE

2)
3)
After testing, if necessary instruct the user in all
the skills necessary for putting the appliance
into operation in conditions of safety, in accor-
dance with legal requirements.
E
B
A
B
C
Turn on the master switch to check the elec-
trical connection.
Check that the safety device is operating cor-
rectly.
D
13

Advertisement

Table of Contents

Troubleshooting

loading

This manual is also suitable for:

0t0bm1e1n0bm2e1t0bm2e

Table of Contents