Chapter 4: Performing Predelivery Checks; Completing Predelivery Checklist; Recording Serial Numbers - MacDon M2170NT Unloading And Assembly Instructions

Narrow transport windrower
Hide thumbs Also See for M2170NT:
Table of Contents

Advertisement

Chapter 4: Performing Predelivery Checks

All pre-delivery and operational checks must be completed before the windrower is delivered to the customer.
1. Perform the predelivery checks listed in the
if absolutely necessary and only in accordance with the instructions in this manual.
2. Perform the operational checks listed on the

4.1 Completing Predelivery Checklist

The predelivery checklist contains all the features of the machine that require inspection.
Perform the final checks and adjustments listed on the
instruction) to ensure that the machine is field-ready. Ensure that the Operator or the Dealer retains the completed
Predelivery Checklist.

4.1.1 Recording Serial Numbers

Serial numbers identify the specific windrower and engine.
Record the windrower and engine serial numbers on the
manifest or work order.
1. Insert a screwdriver into the hole on latch (A). Use the
screwdriver to move the latch toward the right cab-forward
side of the windrower.
2. Grasp louver (B), and lift the hood to open it.
262177
Predelivery Checklist, page
Predelivery Checklist, page
Predelivery Checklist, page 253
Predelivery
Checklist, and confirm the serial number with the
Figure 4.1: Hood
121
253. Make adjustments to the windrower only
253.
(the yellow sheet attached to this
B
A
Revision A

Advertisement

Table of Contents
loading

Table of Contents