Page 1
TP48200E-H12C1 (Nepal, Ncell) V300R001 User Manual Issue Date 2015-05-05 HUAWEI TECHNOLOGIES CO., LTD.
Page 2
Notice The purchased products, services and features are stipulated by the contract made between Huawei and the customer. All or part of the products, services and features described in this document may not be within the purchase scope or the usage scope. Unless otherwise specified in the contract, all statements, information, and recommendations in this document are provided "AS IS"...
Ensure that the product is used in environments that meet its design specifications to avoid damaging components and voiding the warranty. Ensure that only trained and qualified personnel install, operate, and maintain Huawei equipment. Comply with local laws and regulations. The safety instructions in this document are only supplements to local laws and regulations.
2.3 Composition NOTE All ports mentioned in this document are protected by a security mechanism. The TP48200E-H12C1 is composed of the cabinet, temperature control unit (TCU), power distribution unit (PDU), rectifiers, site monitoring unit (SMU), and user interface module (UIM).
Network application over a fast Ethernet (FE) port and an RS485/RS232 port Communication with Huawei NetEco or a third-party network management system (NMS) over protocols such as the Simple Network Management Protocol (SNMP), controller area network (CAN), and Hypertext Transfer Protocol Secure (HTTPS) to...
Figure 4-2 Installing a new rectifier Step 7 Take off protective gloves. ----End Follow-up Procedure Pack the removed component, and return it to Huawei local warehouse. 4.3.2 Replacing a Door Status Sensor Prerequisites You have obtained the cabinet door key and tools.
Step 5 Reset parameters on the SMU. Figure 4-5 Installing an SMU ----End Follow-up Procedure Pack the removed component, and return it to Huawei local warehouse. 4.3.4 Replacing the PCB of UIM02C Prerequisites You have obtained an electrostatic discharge (ESD) wrist strap, a pair of ESD gloves, an ESD box or bag, the cabinet door key, and tools.
Step 12 Disconnect the ground cable from the ESD wrist strap and take off the ESD wrist strap and ESD gloves. ----End Follow-up Procedure Pack the removed component, and return it to Huawei local warehouse. 4.3.5 Replacing an AC SPD Prerequisites ...