HPE ProLiant DL365 Gen11 Maintenance And Service Manual page 77

Table of Contents

Advertisement

12. Remove all DIMMs.
Be sure to note the DIMM slot locations in which each DIMM is installed. These components must be installed in the same locations on
the new system board.
13. Remove the processor heatsink assembly.
14. Loosen the system board thumbscrew, and then remove the system board.
Removing and replacing the SFF optical disk drive/display port/USB
Removing and replacing the SFF optical disk drive/display port/USB
Procedure
Procedure
1. Power down the server.
2. Remove all power:
a. Disconnect each power cord from the power source.
b. Disconnect each power cord from the server.
3. Do one of the following:
a. Extend the server from the rack .
b. Remove the server from the rack .
4. Remove the access panel .
5. If applicable, disconnect the optical disk drive cable from the system board.
HPE ProLiant DL365 Gen11 Server Maintenance and Service Guide
77

Advertisement

Table of Contents
loading

Table of Contents