HPE ProLiant DL365 Gen11 Maintenance And Service Manual page 40

Table of Contents

Advertisement

Removing and replacing the enclosure
Removing and replacing the
Prerequisites
Prerequisites
If you are replacing the enclosure mounting rails from a threaded-hole enclosure, make sure that you have a T-25 Torx screwdriver
available.
About this task
About this task
The illustrations used in this procedure show an icon on the upper right corner of the image. This icon indicates whether the action shown in
the image is for a round-hole, square-hole, or a threaded-hole enclosure.
Round-hole enclosure
Square-hole enclosure
Procedure
Procedure
1. Power down the server.
2. If installed, open the cable management arm.
3. Remove all power:
a. Disconnect each power cord from the power source.
b. Disconnect each power cord from the server.
4. Disconnect all peripheral cables from the server.
5. Remove the server from the enclosure.
6. Place the server on a flat, level surface.
7. To remove the sliding rails, do the following:
enclosure rails
rails
Threaded-hole enclosure
HPE ProLiant DL365 Gen11 Server Maintenance and Service Guide
40

Advertisement

Table of Contents
loading

Table of Contents