HPE ProLiant DL365 Gen11 Maintenance And Service Manual page 51

Table of Contents

Advertisement

To remove blanks from the secondary riser:
a. Lift the latch.
b. Remove the screw securing the PCIe blank.
c. Remove the PCIe blank.
Results
Results
To replace the component, reverse the removal procedure.
Removing and replacing a riser cage
Removing and replacing a riser cage
Procedure
Procedure
1. Power down the server.
2. Remove all power:
a. Disconnect each power cord from the power source.
b. Disconnect each power cord from the server.
3. Do one of the following:
a. Extend the server from the rack .
b. Remove the server from the rack .
HPE ProLiant DL365 Gen11 Server Maintenance and Service Guide
51

Advertisement

Table of Contents
loading

Table of Contents