Install The Cable Gland Plate - Siemens SICHARGE D Operating Instructions Manual

Hide thumbs Also See for SICHARGE D:
Table of Contents

Advertisement

5.5.7

Install the cable gland plate

Adapting the cable gland plate
The number and cross-sections of the power cables may vary depending on the selected
connection to the supply system, the power drawn and whether a dispenser is used. Adjust
the cable gland plates according to the cables you are using.
Power supply cable and external communication cable
The power cables and the external communication via Ethernet are on the front of the
charging station.
Figure 5-26  Cable gland plate
1. Open the device door.
2. Mark the drill holes for the required cable glands. When marking, pay attention to the
following:
– Space around the cable glands for mounting and tightening the cap nut
– Position of the cable glands for good implementation and connection of the power
– Position of the Ethernet cable for external communication (if available)
3. Drill the marked holes
4. Install the cable glands in the drilled holes
5. Guide the conductors, correctly positioned according to the connection points, through
the cable glands of the cable entry plate.
6. Secure the cable gland plate with a tightening torque of 4 Nm.
SICHARGE D
Operating Instructions, 11/2023, A5E50556539-AG
cable
Installation and mounting
5.5 Setting up the charging station
95

Advertisement

Table of Contents
loading

This manual is also suitable for:

8em5907-0aa00-1aa7.06

Table of Contents