Siemens SICHARGE D Operating Instructions Manual page 96

Hide thumbs Also See for SICHARGE D:
Table of Contents

Advertisement

Installation and mounting
5.5 Setting up the charging station
7. Tighten the cap nuts of the cable glands.
8. If necessary, seal the plate with suitable materials to prevent the ingress of moisture and
small animals.
Dispenser
The cable entry plate for the dispenser cables is on the rear of the charging station under the
dispenser busbars.
Figure 5-27  Cable gland plate for the dispenser cables
1. Open the rear device door.
2. Mark the drill holes for the required cable glands. When marking, pay attention to the
following:
– Space around the cable glands for mounting and tightening the cap nut
– Position of the cable glands for good implementation and connection of the DC cables
– Position of the cable gland for the communication cable
– Position of the cable gland of the AUX-230 V cable
– Position of the cable gland of the signal line
3. Drill the marked holes
4. Install the cable glands in the drilled holes
5. Guide the conductors, correctly positioned according to the connection points, through
the cable glands of the cable entry plate.
6. Secure the cable gland plate with a tightening torque of 4 Nm.
7. Tighten the cap nuts of the cable glands.
8. If necessary, seal the plate with suitable materials to prevent the ingress of moisture and
small animals.
96
for the dispenser
Operating Instructions, 11/2023, A5E50556539-AG
SICHARGE D

Advertisement

Table of Contents
loading

This manual is also suitable for:

8em5907-0aa00-1aa7.06

Table of Contents