Commissioning

6.1

Safety precautions before initial commissioning

Before initial commissioning, check the charging station in accordance with the applicable
local regulations, e.g. DIN VDE 0100‑600. This includes, in particular, measurement of the
protective conductor impedance and the insulation resistances. Also check the supply-side
fuse protection of the charging station. Consult the test recommendation with order number
8EM5907‑0AA00‑4AA4 for guidance. Please contact your Siemens office if you do not have
this document.
Ensure that the charging cables have not become loose during transport. If needed, retighten
the cable glands to a maximum torque of 30 Nm.
In addition, refer to the checklist in Appendix B "Checklist for commissioning" (Page 143) to
check all remaining work steps again.
This step is mandatory.