To remove the transport aids, proceed as follows:
1. Remove the hoisting gear from the crane rails.
2. Remove the two rails.
3. Retighten the 4 M12 screws at the edges.
4. Mount the cover plate on the charging station.
6.5
Install the cable gland plate
After you have secured the charging station, re-install the cable gland plate.
Pull the mains cable through the cable gland plate
1. Open the device door.
2. Pick up the cable gland plate.
3. Pull the power cable through the hole in the cable gland plate.
Pull the DC cable through the cable gland plate
If you are installing a charging station for charging via decentralized charge points, pull the
DC cable through the hole in the cable gland plate.
1)
Only applies to equipment variants of the charging station that are set up for SICHARGE UC
Dispenser, SICHARGE MastHood, or SICHARGE MastPanto.
Pulling the Ethernet cable through the cable gland plate
If you are installing a charging station for charging via distributed charge points, pull the
Ethernet cable through the opening in the cable gland plate.
1)
Only applies to equipment variants of the charging station that are set up for SICHARGE UC
Dispenser, SICHARGE MastHood , or SICHARGE MastPanto.
Pull the auxiliary current cable through the cable gland plate
If you are installing a charging station for charging via decentralized charge points, pull the
auxiliary current cable through the hole in the cable gland plate.
1)
Only applies to equipment variants of the charging station that are set up for SICHARGE UC
Dispenser, SICHARGE MastHood, or SICHARGE MastPanto.
SICHARGE UC 150
Operating Instructions, 02/2023, A5E50068475-AB
1
1
1
Installation
6.5 Install the cable gland plate
75