Installation And Mounting; Preparation - Siemens SICHARGE D Operating Instructions Manual

Hide thumbs Also See for SICHARGE D:
Table of Contents

Advertisement

Installation and mounting

5.1

Preparation

An Installation and commissioning video (https://www.youtube.com/watch?v=W6StEHvtZLE)
is available for an overview of the most important steps. Extended version on request.
Tools list
Ensure that before beginning work all required tools, materials and lifting gear is available.
(Additional tools and aids may be needed):
• Personal protective equipment (PPE) (Page 16)
• Fall arrester (Page 16)
• Forklift or crane
• Drill hammer
• Drilling machine
• 12 mm drill bit for concrete
• 4 x M12 stud bolts with approx. 50 mm long thread
• 4 x nuts M12 DIN 934
• 4 x spring washers M12
• 4 x spring washers M12 DIN 125
• Shims for alignment
• Step drill
• Cable knife
• Crimping tool for cable lugs of the cable cross-section used
• Torque wrench up to 70 Nm
• Torque wrench up to 10 Nm
• Socket wrench set up to at least 19 mm width across flats
• Ring wrench set up to at least 19 mm width across flats
• Open-ended wrench, size up to at least 19 mm
• Two pliers wrenches or adjustable open-end wrenches for the cable glands
• Allen key size 2.5 to 6 mm
• Torx screwdrivers TX20 and TX30
• Hammer
• Spirit level
• Stepladder
• Hot air gun
• Shrink-on sleeve for cable diameter used
• Folding ruler
• Permanent marker
• Two-pole voltage tester
• Installation tester
SICHARGE D
Operating Instructions, 11/2023, A5E50556539-AG
5
71

Advertisement

Table of Contents
loading

This manual is also suitable for:

8em5907-0aa00-1aa7.06

Table of Contents