Installing The Cable Clamp - Siemens SICHARGE D Operating Instructions Manual

Hide thumbs Also See for SICHARGE D:
Table of Contents

Advertisement

5.5.5.2

Installing the cable clamp

The following operating instruction shows how to install a cable clamp of the cable
management system.
Figure 5-16  Cable clamp overview
NOTE
Do not pull on the rope with force
Do not pull on the rope with force during the installation of the cable clamp. The spring force
and the rope stopping mechanism can cause injuries or damage to the cable management
system.
1. Measure 2.4 m from the cable outlet of the charging plug. Clean the area with the grease-
dissolving cleaner and cloth. Wrap the rubber adhesive tape
charging cable
the number of windings in the table. Cut off unneeded rubber adhesive tape.
Cable type
EV-T2M4CC-DC250A-...
EV-T2HPCC-DC500A-...
SEVS20-003(S)B_SEVD-02E-...
SICHARGE D
Operating Instructions, 11/2023, A5E50556539-AG
Rubber sphere
Rope
Meander pin
Cable clamp
at this point. The number of windings depends on the cable type. See
Installation and mounting
5.5 Setting up the charging station
M4x14 hexagon socket-head screw
M4 hexagon nut
Rubber adhesive tape, self-adhesive on
one side
Charging cable
overlapping around the
Number of windings
3.5
2
5
89

Advertisement

Table of Contents
loading

This manual is also suitable for:

8em5907-0aa00-1aa7.06

Table of Contents