Fujitsu ORACLE M10-1 Installation Manual page 88

Hide thumbs Also See for ORACLE M10-1:
Table of Contents

Advertisement

c. Secure the power cords with cable clamps.
Figure 4-12     Locking a cable clamp
6.
Hang the power cords from the left side as viewed from the rear of the rack.
Place the power cords over the cable support fixing bracket to hang them there
as is.
7.
Bundle the power cords together with hook-and-loop fastener strips.
Note - When bundling the power cords together with hook-and-loop fastener strips, take
care to secure the extra length necessary for removing the power cords inserted in the power
supply units.
Fujitsu M10-1/SPARC M10-1 Installation Guide ・ March 2019
78
After locking each clasp (A in
front of the chassis to firmly secure the clamp.
A
Figure
4-12), push the cable clamp toward the

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the ORACLE M10-1 and is the answer not in the manual?

Subscribe to Our Youtube Channel

This manual is also suitable for:

Oracle sparc m10-1

Table of Contents