Table 2-1     List of items requiring confirmation before installation (continued)
Check item
Installation
location
Access route
Environmental
conditions
Power supply
facilities
Network
specifications
CPU Activation
2.3
Confirming the Physical Specifications
of the System
This section describes the physical specifications of the system that require
confirmation before installation. Confirm that the installation location meets these
requirements.
- Has the system installation location been determined?
- Does the placement of each chassis meet the service area
requirements?
- Have the chassis been placed so that their air intakes do not
take in exhaust from other equipment?
- Have the rack installation requirements been met?
- Has the access route for the rack been secured?
- Does the installation location meet the temperature and
humidity conditions?
- Can the environmental conditions at the installation location
be thoroughly maintained and controlled?
- Have security measures been established for the installation
location?
- Does the installation location have sufficient fire extinguishing
equipment?
- Do you know the voltage available for the racks where each
chassis and peripheral will be mounted?
- Are the power supply facilities sufficient for the individual
chassis, monitors, and peripherals?
- Are the power supply facilities within an appropriate
distance from the racks?
- Do you have the necessary information for network
connections?
- Has the volume of resources to be used during initial
installation been determined?
- Have the required CPU Activations been ordered?
Chapter 2 Planning and Preparing for System Installation
Check
column
13

Advertisement

Table of Contents
loading

This manual is also suitable for:

Oracle sparc m10-1

Table of Contents